Study on the crack mechanism of face slab of concrete face rockfill dam and its prevention measures
Analysis on the measured settlement and prediction modeling of statistic settlement of Shuibuya CFRD
Back analysis on deformation of Shuibuya CFRD
لینک:
http://en.cnki.com.cn/Article_en/CJFDTotal-SLFD200402011.htm
http://en.cnki.com.cn/Article_en/CJFDTOTAL-SFXB200904016.htm
http://en.cnki.com.cn/Article_en/CJFDTOTAL-SFXB200903016.htm
زبان: چینی
قیمت: 5400 تومان
The settlement data measured in situ of the Shuibuya concrete faced rock-fill dam are analyzed,and a coupled prediction model of exponential statistic settlement is proposed.The monitoring instruments of this dam work in good order,and the measured settlement contours show reasonable trends.The maximum settlement is about 1% of the height of constructed rock-fill dam,and the average of the computed vertical compression modulus is above 100MPa,which indicates a satisfactory compaction quality.The proposed prediction model takes into consideration the influencing factors such as gravity weight,water pressure and rheological properties of rock-fill materials.The predicted maximum settlement of the rock-fill dam will be about 2.46m in 5 years after the dam completion.